| A
36" liner enters the manhole on Kailua Rd. The liner
is inverted into the restraint piping and this section
was sampled and tested. |
Alline's
crew inverts an 8" CIPP liner near Kalawahine Stream.
This deteriorated sewer was rehabilitated without disturbing
the beautiful landscaping. |

Alline
has built a solid reputation over 15 years for reliability,
integrity and technical excellence as Hawaii's premiere contractor
for no-dig utility installation. Alline now brings our standard
of excellence to the pipeline rehabilitation field. In the
last three years we have installed CIPP in sizes ranging from
4 to 30-inches. We are able to rehabilitate lines up to 99-inches
in diameter.
Alline's
CIPP team has many years of experience and has successfully
installed miles of CIPP liner of all sizes nationwide. We
use an adaptable installation processes enabling Alline to
line where others can't, due to challenging site conditions
like steep grades and difficult access.
CIPP Advantages Include:
|
Excavation
of damaged pipe not required
|
Reduced
asphalt, concrete and landscape restoration
|
Restores
structural integrity
|
|
Lower
cost
|
Installs rapidly: minimizes service interruption
|
Stops
infiltration, root intrusion
|
|